Customization: | Available |
---|---|
After-sales Service: | Whole Life |
Warranty: | 12 Months |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1 | Model | BY61-48-1200T |
2 | Function | press melamine paper onto MDF, particle board |
3 | Production capacity | 1200 sheets in 10 hours |
4 | Board loading direction | from 2600mm side of the machine |
5 | Hot platen size | 1400*2600*120mm |
6 | Quantity of hot platens | 2 sheets |
7 | Quantity of floors | single floor |
8 | Distance between hot platens | 300mm |
9 | Hydraulic cylinders | 6 units diameter 320mm, 2 units diameter 110mm |
10 | Pressure capacity | 1200 tons |
11 | Stroke of hydraulic cylinders | 300mm |
12 | Hydraulic cylinders place | Top |
13 | Hydraulic system | pump 10ml/rev, prefill valve,hydraulic manifold block |
14 | Hydraulic system limit pressure | 25 M pa |
15 | Control method | Manual and Automatic control |
16 | Hot platen closing time | about 5 Seconds |
17 | Motor Power | 5.5KW |
18 | In feed method | frequency control loading car |
19 | Out feed method | roller bracket |
20 | Frame style | Combination frame, two groups of frames |
Company Profile
Frequently Asked Questions
1.Can the product be customized?
Yes, we support product customization. Customize different products according to your needs.
2.Does the product have after-sales service?
Yes, we offer both online and offline service with a one-year warranty and lifetime after-sales.
3.Why choose us?
Excellent quality and service, as well as cost-effective products.
4.How to ensure the quality of the product?
Welcome to our factory to see the production process.
5.Who is responsible for the installation and commissioning of the machine?
We have more than 15 technicians on site to guide, install and commission the equipment.